Why Heavy Lifting is Slowing Down Generator Installs (And What to Do About It)
- sam7726
- Apr 3
- 1 min read
The Problem: Heavy, Outdated Materials
Let’s discuss a pain point every contractor and installer has faced: wrestling with heavy, awkward materials.
If you’ve ever struggled to place a concrete Generator pad, you already know the issues:
❌ Weight – Concrete pads are back-breaking to move
❌ Breakage – One drop, and it cracks
❌ Absorbs Water – Leads to frost heaving & shifting
Now multiply this by every job site you manage. How much extra time and effort is being wasted?
The Solution: Power Pads – Built for Speed & Strength

🚀 Power Pads are engineered to make your life easier. Here’s how:
✔ 75% lighter than concrete → Carry & install without extra hands
✔ Crack-proof & weather-resistant → No callbacks due to shifting
✔ Naturally vibration-dampening → Protects equipment

That means less labor, fewer headaches, and more jobs completed faster.
💡 Would you rather struggle with concrete or finish installs hassle-free?
👉 Learn more about Power Pads here: Power Pad | Standby Generator Pads
Comments